| Issue |
2010
|
|
|---|---|---|
| Article Number | 08001 | |
| Number of page(s) | 6 | |
| Section | Pathfinders | |
| DOI | https://doi.org/10.1051/ao4elt/201008001 | |
| Published online | 24 February 2010 | |
A Sample of GeMS Calibrations and Control Schemes
1
Gemini Observatory, c/o AURA, Casilla 603 La Serena, Chile
2
Observatoire de Paris-Meudon, 2 Place Jules Janssen 92195 Meudon-CEDEX
France
a e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Abstract
The Gemini MCAO system, GeMS, is currently undergoing integration and test at the Gemini South base facility. GeMS has been in the work since 2001, and is finally reaching a state in which all the subsystems, except for the 50W laser, have been received, integrated and, in the large part, tested. In this paper, after a brief description of the system, we describe selected methods and results that we have obtained during the on-going integration period.
© Owned by the authors, published by EDP Sciences, 2010

